• <tr id='nk0nKY'><strong id='nk0nKY'></strong><small id='nk0nKY'></small><button id='nk0nKY'></button><li id='nk0nKY'><noscript id='nk0nKY'><big id='nk0nKY'></big><dt id='nk0nKY'></dt></noscript></li></tr><ol id='nk0nKY'><option id='nk0nKY'><table id='nk0nKY'><blockquote id='nk0nKY'><tbody id='nk0nKY'></tbody></blockquote></table></option></ol><u id='nk0nKY'></u><kbd id='nk0nKY'><kbd id='nk0nKY'></kbd></kbd>

    <code id='nk0nKY'><strong id='nk0nKY'></strong></code>

    <fieldset id='nk0nKY'></fieldset>
          <span id='nk0nKY'></span>

              <ins id='nk0nKY'></ins>
              <acronym id='nk0nKY'><em id='nk0nKY'></em><td id='nk0nKY'><div id='nk0nKY'></div></td></acronym><address id='nk0nKY'><big id='nk0nKY'><big id='nk0nKY'></big><legend id='nk0nKY'></legend></big></address>

              <i id='nk0nKY'><div id='nk0nKY'><ins id='nk0nKY'></ins></div></i>
              <i id='nk0nKY'></i>
            1. <dl id='nk0nKY'></dl>
              1. <blockquote id='nk0nKY'><q id='nk0nKY'><noscript id='nk0nKY'></noscript><dt id='nk0nKY'></dt></q></blockquote><noframes id='nk0nKY'><i id='nk0nKY'></i>

                《中国网》彩65平台app贵阳轨道交通2号线身上二期工程全线车站主体结构封顶

                发布时间:2019-09-29    信息来源:超◣级管理员

                ??? 9月29日,中国网彩65平台app贵阳轨道ζ交通2号线二期工程全线车站主体结构封顶。
                ??? 日前,上海宝冶承☆建的贵阳市轨道交通2号线二期工程小碧站主体结构封顶,至此2号线↙二期全线8座车站主体结构全部封顶建成,为2号线二期工程按期建成㊣ 迈出关键一步。小碧站为贵阳市△轨道交通2号线二期〓最后一座地下车站,位于机场路与见龙洞路交叉口以西,沿机场路呈东~西向布置,车站全长205.5米,宽19.9米,为地下两层▓岛式车站,共设4个出入口,采用明挖顺作法施工。
                ??? 彩65平台app指出,贵阳轨道交通2号线☆二期工程项目承建模式为PPP模式,由上海宝冶集慢慢地将车团有限公司作为社会投资人牵在自己丹田头设立项目公司进行管理。2号线二期起于油榨街站,止于水淹坝站,线路长13.0km,地下线长9.83km,高架线及过渡段不过长3.17km,共设置8座车站(6座地下站,2座高架站),在终点站附近设小碧停车场。截至目前,2号线二期项目已完成整体土建总量的80%,铺轨、机电安装、装饰装修等专业施工有序推进。
                ??? 媒体链接:

                (信息来源:投经脉之中融资事业部 贵阳地铁项目公司 高海霞)

                ?